mobile mast : 16 april 2004
added 03-05-04
With the initial layer of the foundations now dried the sub-frame
and reinforcement rods have begun to be put in place. On the right
hand side of the excavation the plastic ducting, which will carry
the cable from the control box on the bottom right to the base of
the mast, can be seen ready to be embedded in concrete.

|
|
|